.claude/skills/estimate/SKILL.md
Produces time and complexity estimates for features, tasks, or sprints using story points, t-shirt sizing, or day estimates. Use when the user asks for an estimate, wants to size a feature, or mentions estimation or planning poker.
npx skillsauth add tranhieutt/software_development_department estimateInstall this skill globally with one command. Works with Claude Code, Cursor, and Windsurf.
3 of 9 scanners reported clean
Some scanners were skipped, did not run, or reported a non-clean status. Review each row below.
When this skill is invoked:
Read the task description from the argument. If the description is too vague to estimate meaningfully, ask for clarification before proceeding.
Read CLAUDE.md for project context: tech stack, coding standards, architectural patterns, and any estimation guidelines.
Read relevant design documents from design/docs/ if the task relates
to a documented feature or system.
Scan the codebase to understand the systems affected by this task:
Read past sprint data from production/sprints/ if available:
Analyze the following factors:
Code Complexity:
Scope:
Risk:
Generate the estimate:
## Task Estimate: [Task Name]
Generated: [Date]
### Task Description
[Restate the task clearly in 1-2 sentences]
### Complexity Assessment
| Factor | Assessment | Notes |
|--------|-----------|-------|
| Systems affected | [List] | [Core, business, UI, etc.] |
| Files likely modified | [Count] | [Key files listed below] |
| New code vs modification | [Ratio, e.g., 70% new / 30% modification] | |
| Integration points | [Count] | [Which systems interact] |
| Test coverage needed | [Low / Medium / High] | [Unit, integration, manual] |
| Existing patterns available | [Yes / Partial / No] | [Can follow existing code or new ground] |
**Key files likely affected:**
- `[path/to/file1]` -- [what changes here]
- `[path/to/file2]` -- [what changes here]
- `[path/to/file3]` -- [what changes here]
### Effort Estimate
| Scenario | Days | Assumption |
|----------|------|------------|
| Optimistic | [X] | Everything goes right, no surprises, requirements are clear |
| Expected | [Y] | Normal pace, minor issues, one round of review feedback |
| Pessimistic | [Z] | Significant unknowns surface, blocked for a day, requirements change |
**Recommended budget: [Y days]**
[If historical data is available: "Based on [N] similar tasks that averaged
[X] days actual vs [Y] days estimated, a [correction factor] adjustment has
been applied."]
### Confidence: [High / Medium / Low]
**High** -- Clear requirements, familiar systems, follows existing patterns,
similar tasks completed before.
**Medium** -- Some unknowns, touches moderately complex systems, partial
precedent from previous work.
**Low** -- Significant unknowns, new technology, unclear requirements, or
cross-cutting concerns across many systems.
[Explain which factors drive the confidence level for this specific task.]
### Risk Factors
| Risk | Likelihood | Impact | Mitigation |
|------|-----------|--------|------------|
| [Specific risk] | [High/Med/Low] | [Days added if realized] | [How to reduce] |
| [Another risk] | [Likelihood] | [Impact] | [Mitigation] |
### Dependencies
| Dependency | Status | Impact if Delayed |
|-----------|--------|-------------------|
| [What must be done first] | [Done / In Progress / Not Started] | [How it affects this task] |
### Suggested Breakdown
| # | Sub-task | Estimate | Notes |
|---|----------|----------|-------|
| 1 | [Research / spike] | [X days] | [If unknowns need investigation first] |
| 2 | [Core implementation] | [X days] | [The main work] |
| 3 | [Integration with system X] | [X days] | [Connecting to existing code] |
| 4 | [Testing and validation] | [X days] | [Writing tests, manual verification] |
| 5 | [Code review and iteration] | [X days] | [Review feedback, fixes] |
| | **Total** | **[Y days]** | |
### Historical Comparison
[If similar tasks exist in sprint history:]
| Similar Task | Estimated | Actual | Relevant Difference |
|-------------|-----------|--------|-------------------|
| [Past task 1] | [X days] | [Y days] | [What makes it similar/different] |
| [Past task 2] | [X days] | [Y days] | [What makes it similar/different] |
### Notes and Assumptions
- [Key assumption that affects the estimate]
- [Another assumption]
- [Any caveats about scope boundaries -- what is included vs excluded]
- [Recommendations: e.g., "Consider a spike first if requirement X is unclear"]
Deliver exactly:
testing
Generates high-fidelity architecture diagrams, sequence flows, and component maps for SDD projects. Use when finalizing a design phase, documenting system architecture, or visualizing agentic workflows. Default style: Style 6 (Claude Official).
data-ai
Provides vector database and semantic search patterns for Pinecone, Weaviate, Qdrant, Milvus, and pgvector in RAG and recommendation systems. Use when implementing vector search or when the user mentions vector database, semantic search, embeddings, or similarity search.
development
Updates docs/technical/CODEMAP.md by scanning the current codebase structure. Run after a significant feature merge, refactor, or when CODEMAP feels stale.
development
Unlocks the codebase after a release freeze or incident freeze period to resume normal development. Use when a freeze period ends or when the user mentions unfreezing or lifting the code freeze.