skills/arckit-au-aescsf/SKILL.md
[COMMUNITY] Generate an Australian Energy Sector Cyber Security Framework maturity assessment for energy-sector projects with IT, OT, market, and grid-edge dependencies.
npx skillsauth add tractorjuice/arckit-codex arckit-au-aescsfInstall this skill globally with one command. Works with Claude Code, Cursor, and Windsurf.
3 of 9 scanners reported clean
Some scanners were skipped, did not run, or reported a non-clean status. Review each row below.
WARNING: Community-contributed command - not part of the officially-maintained ArcKit baseline. Output must be reviewed by qualified energy-sector cyber security, OT security, regulatory, legal, and operational risk advisers before reliance. Verify the current AESCSF version, publication date, AEMO source availability, and applicable entity obligations before external use; if AEMO resources are unavailable, record the attempted access date and re-check before finalising.
You are an enterprise architect generating an Australian Energy Sector Cyber Security Framework (AESCSF) maturity assessment for an Australian energy-sector project, asset, market interface, OT environment, DER platform, or regulated energy business capability.
$ARGUMENTS
The Australian Energy Sector Cyber Security Framework is an energy-sector cyber maturity framework coordinated through AEMO and industry partners. Use it as an authoritative energy-sector anchor while avoiding verbatim reproduction of detailed AESCSF source text. This artefact complements $arckit-au-e8-posture, $arckit-au-ism-controls, $arckit-au-ot-security, and $arckit-au-soci-cirmp by translating baseline cyber, OT, and critical-infrastructure evidence into an energy-specific maturity view.
Authoritative anchors:
Read prerequisites:
projects/000-global/ARC-000-PRIN-*.md if present.ARC-{P}-AUE8-v*) if available.ARC-{P}-AUISM-v*) if available.ARC-{P}-AUOT-v*) if available.ARC-{P}-AUSOCI-v*) if available..arckit/templates/_partials/RENDERING.mdRead the template:
.arckit/templates-custom/au-aescsf-template.md (user override).arckit/templates-custom/au-aescsf-template.md.arckit/templates/au-aescsf-template.mdUse scripts/bash/create-project.sh --json <project-name> if the project does not yet exist.
Use scripts/bash/generate-document-id.sh <PROJECT_ID> AUAESCSF --filename for the artefact filename.
Resolve the <!-- DOC-CONTROL-HEADER --> marker per RENDERING.md. Use the Australian classification scheme (UNOFFICIAL / OFFICIAL / OFFICIAL:Sensitive / PROTECTED / SECRET) -- replace the standard UK line in the header.
Generate the following sections:
Energy Context and AESCSF Scope - identify the energy sub-sector, asset or platform, market role, operational environment, criticality, and AESCSF applicability assumptions.
Criticality and Target Maturity Profile - document business criticality, safety and market impacts, target maturity rationale, and any legal or regulatory assumptions requiring qualified review.
Domain Maturity Assessment - assess maturity by AESCSF capability domain using current evidence, target state, gaps, owners, and uplift actions. Do not quote detailed AESCSF source text verbatim.
OT/IT and Grid-Edge Findings - require OT/IT zone and conduit diagrams, DERMS / DOE / CSIP-AUS flows where applicable, field telemetry, metering, control-room, and grid-edge dependency evidence.
Architecture Evidence - require OT/IT zone and conduit diagrams, IT/OT data flows, DERMS/DOE/CSIP-AUS flows, vendor remote-access paths, energy data-model dependencies, and cross-references to DFD, diagram, data-model, traceability, and risk evidence.
IT/OT and Market Data Flows - document IT/OT flows, AEMO or market interfaces, settlement or metering flows, telemetry, API exchanges, file transfers, and protocol gateways.
Energy Data Model Dependencies - identify dependencies across network assets, DER, meters, NMI / customer records, market settlements, telemetry, outage, switching, and operational data.
Asset, Interface, and Evidence Inventory - identify source-of-truth registers for OT assets, IT systems, DERMS / DOE platforms, market interfaces, APIs, telemetry links, metering assets, vendor remote-access paths, data catalogues, control evidence, owners, criticality, and inventory gaps. Where ServiceNow or another CMDB exists, cross-reference $arckit-servicenow output and ensure inventory rows can be visualised with colour-coded criticality, maturity, or risk status.
Diagram and Traceability Handoffs - list required $arckit-dfd, $arckit-diagram, $arckit-data-model, $arckit-traceability, and $arckit-risk updates.
AESCSF Anti-Pattern Register - call out flat OT networks, undocumented market interfaces, unmanaged vendor remote access, stale DER integration assumptions, missing data ownership, and unsupported control-room dependencies.
Federal Baseline Cross-Reference - map relevant findings to $arckit-au-e8-posture, $arckit-au-ism-controls, $arckit-au-ot-security, and $arckit-au-soci-cirmp.
Maturity Gaps and Risk Treatment - convert maturity gaps into risk treatments with owner, due date, evidence artefact, and residual risk.
Uplift Roadmap - prioritise immediate, 30-90 day, 90-180 day, and strategic uplift actions.
Populate the External References section per .arckit/references/citation-instructions.md. AEMO AESCSF, the verified AESCSF version / publication date, access date, and any AEMO availability issue MUST appear in the Document Register.
Write the artefact via the Write tool to projects/<project-id>/<filename>.
Show only a summary to the user: AESCSF scope, target maturity, highest-risk gaps, architecture evidence gaps, and top five uplift actions.
$arckit-au-soci-cirmp; where it includes connected OT, cross-reference $arckit-au-ot-security.$arckit-data-model for data catalogues, $arckit-servicenow for CMDB/service inventory, $arckit-dfd and $arckit-diagram for colour-coded visualisation, $arckit-risk for heat/scoring, $arckit-maturity-model for maturity criteria, and $arckit-graph-report for coverage gaps.After completing this command, consider running:
$arckit-au-e8-posture -- Essential Eight posture provides the enterprise cyber baseline for AESCSF maturity evidence.$arckit-au-ism-controls -- ISM applicability provides control evidence and government security cross-references for AESCSF gaps.$arckit-au-ot-security -- OT security findings provide zone, conduit, connectivity, and remote-access evidence for energy OT environments.$arckit-au-soci-cirmp -- SOCI/CIRMP evidence supports critical-infrastructure risk treatment and incident escalation context.$arckit-dfd -- Data-flow diagrams provide IT/OT, market, DERMS, DOE, CSIP-AUS, and vendor-access evidence.$arckit-diagram -- Architecture diagrams provide OT/IT zone, conduit, ring, market, and grid-edge context.$arckit-data-model -- Energy data-model dependencies identify asset, metering, settlement, DER, telemetry, and customer data impacts.$arckit-servicenow -- CMDB and service inventory evidence maps architecture components, dependencies, owners, and support criticality.$arckit-maturity-model -- Maturity scoring can calibrate AESCSF capability levels and evidence thresholds.$arckit-traceability -- Traceability links AESCSF findings to requirements, obligations, controls, decisions, and evidence.$arckit-risk -- AESCSF maturity gaps and residual exposures should feed the project risk register.$arckit-graph-report -- Governance graph metrics show coverage, cross-reference density, and missing evidence links across registers.tools
Procurement market intelligence — award-value benchmarks, top suppliers, incumbency and concentration, from the UK Tenders MCP
tools
Competitor landscape — rival suppliers, awarded-value market share, head-to-head and concentration, from the UK Tenders MCP
development
[COMMUNITY] Generate a SOCI Act Critical Infrastructure Risk Management Program (CIRMP) governance and evidence pack for Australian critical infrastructure assets.
development
[COMMUNITY] Generate an ASD operational technology cyber security assessment for Australian Government and critical-infrastructure projects with connected OT environments.