Invoke on any planning trigger from the PM — "plan", "let's plan", "write a plan", "draft a plan", "break this down", "plan the implementation" — for decision-weight work (multi-file, abstraction, cross-system, agent scaffold, reversed prior). Triage lives inside the skill, not in EM pre-skill judgment; writing a plan to disk without invoking this skill is a doctrine violation.
npx skillsauth add oduffy-delphi/coordinator-claude planInstall this skill globally with one command. Works with Claude Code, Cursor, and Windsurf.
3 of 9 scanners reported clean
Some scanners were skipped, did not run, or reported a non-clean status. Review each row below.
Trigger: EM is about to plan implementation work where the spec carries decision weight (multi-file, new abstraction, cross-system, scaffolds new agents/skills (decision-weight → plan, NOT architectural-tier → not a staff-session; see When NOT to use), reverses a prior decision) OR the PM has typed "write a plan", "break this down", "plan the implementation".
When NOT to use: Trivial work (single-file fix, typo, link repoint, no abstraction) → just do it. Implementation-only ambiguity mid-coding → harness Plan tool inline. Architectural-tier (cross-system irreversible, multi-stakeholder) → surface to PM first. Note — a new skill/agent scaffold is non-trivial (Branch B), NOT architectural-tier: "novel" / "new surface" / "new skill/agent scaffold" / "be careful" / "this is unfamiliar" are conservative-bias tells, not the four positive criteria. Architectural-tier requires one of cross-system-irreversible / multi-stakeholder / security-privacy-boundary / naming-collision-with-product-policy. Skill-scaffolds route to Branch B/C, not a staff-session (2026-05-18: repeated over-escalation on "novel"/"be careful" framing alone). PM in exploration mode or problem-shape not yet converged → coordinator:shape first (see Branch A). Spec vague or multi-subsystem → coordinator:brainstorming first. Skill-authoring (writing a SKILL.md) → plugin-dev:skill-development. Plan already written and needs review → coordinator:review. Stuck pattern → see docs/wiki/stuck-detection.md.
Condition: EM has just received a planning trigger; first decision is whether a plan doc is the right artifact.
/pickup <file> or named a handoff, and that handoff's body says "plan-shaped, not straight-to-executor", "invoke /plan", "decompose before executing", or equivalent)
→ The plan is already authorized — do NOT ask "want me to plan?". A handoff is a PM-authored artifact (only the PM creates one), so a plan trigger embedded in a PM-handed pickup satisfies the /plan keyword-gate transitively. Proceed into this skill directly. A T3 spinoff fork of the workstream stays separately PM-gated (it creates a new continuity artifact — surface it as a one-line candidate per skills/spinoff Step 0) but must NOT block or be conflated with the plan. See CLAUDE.md § Challenging the PM ¶ /plan exemption; also skills/pickup Notes "T3 detection". Continue to Branch B.coordinator:shape before committing to plan — converge on the problem (the PRD half) first; its exit gate chains back here. This is the seam where premature convergence happens, and the EM-side complement to the global First Officer Engagement-Modes doctrine (which is personal and does not ship). Precedence: a PM session axiom and the architectural-tier check both take precedence — /shape is the exploration/unconverged-problem branch, NOT an override of a PM directive to plan named work. Discriminating test vs. brainstorming: if the PM HAS a problem and wants confirmation you understood it (vs. not knowing what to build at all) → coordinator:shape, not coordinator:brainstorming.coordinator:plan anyway — do NOT execute directly off the handoff's t-shirt. Handoff t-shirt sizing from inside an investigation is systematically too low for cross-repo plans: investigation reveals the structural problem ("here's what's wrong, here's the fix shape"), but planning reveals the implementation blast radius (N repos, M reviewers, contract fixtures, framing-inversion checks). The two scopes are different. The 2026-05-21 unreal-toml-concern handoff is the empirical case — tagged tshirt: XS ("investigation complete, straight execution"), actual scope was 3 repos / 4-reviewer pipeline / Decision-#0 framing inversion caught at review / a real bug discovered in peer-repo reference impl / ~2000 LOC. The handoff scope is "decide what to build"; the plan scope is "decide how it ships across N repos with M reviewers." T-shirt promotes from inside the plan body, not from inside the handoff. Continue to Branch B./staff-session, want me to draft the staff-session brief?" Wait for PM. See CLAUDE.md § Challenging the PM and § Plan-First Workflow.
/staff-session on "novel"/"be careful" framing alone (2026-05-18). See the top-of-body When-NOT-to-use block (the canonical anti-trigger home per super-skill-architecture.md:58 Rule 7); this bullet reinforces it in-tree.Condition: a plan doc is the right artifact; substrate must be verified BEFORE the plan body is drafted.
Runs first — problem-shape is the highest substrate; verifying you understood the problem precedes verifying the file paths that solve it. This is the always-on floor that catches the case where Branch A's /shape offer was declined or skipped (the "just roll with it" case).
/shape ran, or docs/problems/<slug>.md is cited in plan frontmatter via problem_set:) → cite it; the doubt-check is satisfied; proceed to substrate verification.scope_mode is feature / architecture / spike → produce the forced-articulation block before drafting tasks (and surface its material items to the PM): (1) restate the problem(s) in the PM's vocabulary, falsifiably; (2) name your single biggest uncertainty per the un-gaming clauses below; (3) flag any intent you inferred that the PM did not state.scope_mode is production-patch / audit (obvious one-line problem) → the doubt-check is a single restating sentence, not the full triad. Proportional to scope — matches the coverage nudge's silence for these scope_modes, and honours P5 (AC7: no gate fires heavily on trivial work).Un-gaming clauses for step (2) — a yes/no "I have the shape ✓" is a banned response (EM confidence is coupled with helpfulness and self-reports green every time):
~/.claude/CLAUDE.md § PM Altitude. Resolving them is your job; surfacing them is noise.Discriminating test vs. brainstorming, if the doubt-check reveals the problem itself is unconverged: if the PM HAS a problem and wants confirmation you understood it (vs. not knowing what to build at all) → coordinator:shape, not coordinator:brainstorming.
Known boundary: this floor protects the plan path only. Work mis-triaged as "trivial → just do it" at Branch A bypasses both /shape and the doubt-check by construction — there is no floor on the just-do-it path. The mitigation is EM alertness to exploration signals at the Branch A routing row, not a second doubt-check (which would over-ceremony the trivial path, violating P5). Named here as a known boundary, not a silent one.
ls docs/plans/<today's-date>* AND git log --since=today --oneline -- docs/plans/. If another session has already authored a plan for the same scope today, surface the collision to the PM before proceeding. Two concurrent EMs independently planning the same work is the failure mode; the concurrent-session check fires here, before any scout or reviewer has spent tokens, not at the cross-plan conflict scan in Branch C (which runs after drafting). See also docs/wiki/writing-plans.md § pre-plan substrate check must include today-dated plans and recent git log.
→ source_memo: collision check (when this plan actions a cross-repo memo). If the plan was triggered by a memo accept — i.e. it carries (or will carry) a source_memo: frontmatter pointer — additionally grep every plan for a sibling already citing the same memo: grep -l "source_memo:.*<memo-basename>" docs/plans/*.md plus a body-mention fallback: grep -l "<memo-basename>" docs/plans/*.md. A hit means another session already routed a plan from this memo (the 2026-06-23 holodeck B3 collision: two sessions realized the same accepted memo because nothing cross-checked source_memo at plan-write time). Surface the collision to the PM before drafting — same as the today-dated filename case. Residual (not assumed-covered): this catches the plan-routed collision only; a commit-only or inline realization leaves no plan carrying source_memo:, so those collisions are caught instead by the M2.5 memo claim-lock (while in_progress) and the archived realized_by claim-of-record (after actioned), not by this grep. See docs/wiki/writing-plans.md § pre-plan substrate check; skills/pickup/SKILL.md M3 (realized_by).file:line (one level above each proposed edit site) AND can name a concrete reason patching the upper layer is wrong (registry already gates this case; upper layer is closed contract; upper layer is hot-path with unrelated callers).
→ Red: planner cannot articulate why the upper layer is the wrong locus, OR the upper layer is a registry/dispatch/extension site that already has the gate type the patch would re-implement at the call site.
→ Action on red: loop back to investigation Tier 1–3 on the upper-layer mechanism (Tier 2 / project-RAG preferred when indexed; Tier 3 grep works on unindexed repos). If an upper-layer gate exists, reframe the plan around extending it, not patching the call site. See docs/wiki/writing-plans.md for the planning-time discipline (Fix-locus discrimination). CLAUDE.md § Pre-Dispatch Verification carries the analogous review-time discipline (¶ Reviewer rationale must discriminate).ls, grep -c, head_limit:0 for enumerations). Any drift → fix the plan substrate before drafting body. See CLAUDE.md § Pre-Dispatch Verification ¶ verify file paths and ¶ paginated grep.docs-checker verifies the external API claim is correct — it does NOT verify that the in-repo symbol you plan to change still exists in the shape you assume (a concurrent session or a prior commit may already have shipped the fix, renamed the symbol, or removed it). For every change-existing-code chunk, grep the literal symbol/string the plan proposes to replace; confirm it is present, at the cited path, in the assumed form. Absent or already-changed → the fix-locus has shipped or moved: re-investigate (Tier 1–3) and amend the plan substrate before drafting the chunk. This is orthogonal to fix-locus discrimination (which layer to patch) above — this is fix-locus liveness (is the patch target still there). It is also distinct from the path-verification row immediately above: that row confirms the FILE exists at the cited path; this row confirms the SYMBOL inside it still has the shape you plan to replace — a file can be present at the right path while the symbol within it has already been renamed, removed, or shipped. See CLAUDE.md § Pre-Dispatch Verification ¶ "Spec is not authoritative on call-site count or constant identity" and ¶ "Survey plan-substrate state before dispatching."state/lessons.md and wiki for the central nouns + prohibition vocabulary). See docs/wiki/writing-plans.md § Negative-Search Before Drafting.file:line citations to the dispatch brief. See CLAUDE.md § Pre-Dispatch Verification ¶ native-code plans.'N' / "N"), fmt-string form ({n} / %d), and comment form (# step N, // route N). Bare-number grep misses string-form citations; string-form grep misses comment-form. Internal cross-references rot silently when only the canonical declaration site is found.UE_REGISTER_*, register_action, plugin-style auto-registration). If yes, the plan MUST use the registered surface; adding a parallel else if / switch / hand-rolled lookup is a recurring footgun that re-introduces dispatch-fragility bugs. Project-level wikis carry the concrete instances (see docs/wiki/writing-plans.md for project-specific examples).docs/wiki/writing-plans.md for the cross-repo port checklist.Condition: substrate verified; ready to draft body. The four PM doctrinal lenses bind here — this branch is where the wrong shape gets baked in.
Lenses applied in rows 2–5 below: time (agent-scoped only) / refactor>patch / PM-owned YAGNI / soon=now.
Scope mode declared? (prototype | production-patch | feature | architecture | spike)
→ Pick one before drafting tasks. Mode shapes review depth and the evidence bar. See docs/wiki/writing-plans.md § Scope Mode.
Acceptance criteria testable + time framed for agents, not humans?
→ Each AC is a binary pass/fail check. Time annotations OK when agent-scoped ("this dispatch runs ~90s"); reject human-sprint framing ("two-week effort", "Q3 milestone"). See CLAUDE.md § Plan-First Workflow ¶ don't-import-human-effort-timelines (project-level) and § Operating Assumptions (global ~/.claude/CLAUDE.md).
Plan will go through coordinator:review? (the gate predicate — any plan of non-trivial scope)
→ Use the bindable-table form for ## Acceptance Criteria: ID | Criterion (prose) | Test (typed-prefix) | Binding-Class | Status. Pre-review, Test cells are pending realization; the reviewer reads prose criteria as a design lens. Post-review, each gate-bound row is realized as a named failing test using the typed-prefix scheme below. At done-time, the green-gate enforces these rows at coordinator:workstream-complete Step 3.8.
Supported typed-prefixes for AC Test cells — transcribe verbatim, do not author from memory:
pytest:<path> or pytest:<path>::ClassName::method_name
grep:<pattern>@<path> or grep:<pattern>@<path1>,<path2> ← '@' separator REQUIRED
cited:<absolute-path> ← path only; prose descriptors fail at resolve time
sh:<command> — shell, exit 0 == green
bash:<command> — bash, exit 0 == green
bats:<test-file>
node:<path> -t <test-name>
cargo:<test-name>
Combinator: <prefix1:…> AND <prefix2:…> ← homogeneous AND/OR only; all-pass / any-pass
<prefix1:…> OR <prefix2:…> ← ≥2 operands; mixed AND+OR in one cell rejected
git: is NOT a supported prefix — use sh:git log --oneline <range> | wc -l | grep -q 6 instead. The full two-altitude flow and binding-class semantics live at docs/wiki/writing-plans.md § Acceptance Oracle (outer-loop). Schema-shape errors surface at Phase 4a (check-acceptance-oracle.sh) — the cost of fixing a shape-invalid cell at plan-write time is one Edit; the cost at Phase 4a is "explain why the oracle returned 0/11 green on a 100% green workstream."
Refactor-or-patch decision: which is correct here? → Default to refactor when AI is the implementer and the patch is in a patch-accumulating area. If a reviewer would propose a refactor, propose it now. See CLAUDE.md § Core Principles ('Do the right thing, not the easy thing').
A "we'll add X later" / scope-trim / YAGNI argument is part of the draft? → Always surface to PM — never EM-unilateral. YAGNI is a product call. See CLAUDE.md § Challenging the PM ¶ ask the PM when.
A "soon = now" deferral candidate? (an item the draft would defer because the EM thinks it's lower priority than the headline work)
→ Either ship it in this plan or get explicit PM disposition. No silent deferrals. See CLAUDE.md § Plan-First Workflow ¶ implement-and-iterate (project-level) and § Operating Assumptions (global ~/.claude/CLAUDE.md).
Each chunk has an identified test surface? AND each gate-bound test-AC has a named producer chunk?
→ For each chunk, name the test (or explicitly document why no test). Fire this BOTH directions: chunk→test (every chunk names its test) AND test→chunk (every gate-bound AC of the form pytest:test_X.py::Y / bash:tests/Z.sh has a wave chunk whose write-files include that test FILE — not just the test path). A gate-bound test-AC with no producer chunk is a guaranteed /workstream-complete Step 3.8 hard-block: the oracle reads red because the test was never authored. The implementation chunk does not author its tests unless the brief says so explicitly. See docs/wiki/test-design-discipline.md and docs/wiki/writing-plans.md § Bite-Sized Task Granularity. (Empirical: 2026-06-15 native-mcp-transport plan named 11/13 ACs as typed-prefix tests but only 1 chunk authored a test → 1/13 green at done-time.)
Plan will hand off to an executor agent? (sub-conditions are additive — apply baseline always, plus any modifiers that apply)
docs/wiki/writing-plans.md § Hard Constraints (a) — Explicit file-scope, (e) — No fallback escape hatches.docs/wiki/writing-plans.md § Hard Constraints (g) — File-overlap analysis.docs/wiki/writing-plans.md § Hard Constraints (b) — Read-only orchestrators.docs/wiki/writing-plans.md § Hard Constraints (f) — Concurrency-safe file design.A single chunk would hand ONE executor multiple independent deliverables? (N new modules, N disjoint files, N separable sub-tasks whose write targets do not overlap — the "one executor authors 7 modules" shape)
→ Decompose it into N chunks at plan-write time — fan-out-shaped chunking is a plan-author obligation, not an execution-time afterthought. Schema-coupling pointer: this row is the prevention surface; the late-correction surface is skills/execute-plan/SKILL.md "Phase 1.6 Dispatch Ledger" (disjoint-write-target expansion at ledger-write time). Doctrine root: docs/wiki/dispatching-parallel-agents.md "Coupling Rules Out Concurrency". The ledger schema lives only in execute-plan; no duplication here. A chunk is a fan-out candidate, not a single dispatch, whenever its deliverables have disjoint write targets. The ONLY justifications for keeping multiple deliverables in one chunk are (a) genuine write-overlap (two deliverables edit the same path — and even then it's a sequence of small dispatches per the Coupling Rules, not one fat executor) or (b) an unpinnable shared interface. A shared read-only source and a pinned import contract are NOT serialization reasons — reading a common file and importing a pinned interface are reads, not writes, and only WRITE-overlap gates parallelism. A plan that collapses N disjoint-write deliverables into one executor under a "file-overlap" justification has mistaken read-overlap for write-overlap — the exact 2026-05-29 failure (one executor handed 7 modules sharing only a read-only semantic.py + a pinned import) this row exists to prevent. Size each resulting chunk to ~5–10 min on one coherent surface (15 min hard ceiling). See CLAUDE.md § Subagent Dispatch (HARD RULE — small-remit-and-many). Also: docs/wiki/dispatching-parallel-agents.md "Read-Overlap Is NOT Write-Overlap" and "Coupling Rules Out Concurrency, Not Decomposition".
Plan renames or moves any path? (any task contains git mv, a path rename, a file relocation, or a directory restructure — the trigger is path movement, not scope_mode)
→ Schedule a post-execution doc-link-checker dispatch by default as the plan's closeout chunk — SUBJECT to the worker's substrate precondition below. Renames orphan inbound doc links (wiki cross-refs, README index entries, spec backlinks, @-imports) that the renaming executor does not see. The plan body MUST include a terminal closeout chunk: "post-execution: dispatch doc-link-checker over docs/, *.md, and spec-backlink surfaces for links to the moved paths." This is default-on for any path-moving plan regardless of scope_mode; scope_mode: architecture plans almost always qualify, but a single git mv in a production-patch plan triggers it too.
→ Dispatch condition (substrate precondition — reviewer-routed-workers.md:79-87): schedule the dispatch ONLY when the moved paths have RELATIVE inbound markdown links NOT already covered by validate-references (in run-all-checks) OR PUBLIC-URL inbound links. Skip (and note why) when inbound links are private-repo absolute self-URLs (the worker returns 401/404 with no auth — no signal) or are already covered by run-all-checks/validate-references (the relative-link leg is redundant). The #anchor-resolution check that doc-link-checker uniquely adds only works post-merge by an authed human — note it for one-click post-merge sanity rather than reflex-dispatching the worker into abstention. See docs/wiki/reviewer-routed-workers.md § doc-link-checker Substrate Precondition (:79-87), docs/wiki/writing-plans.md § Close-Out Chunks, and Reviewer-Routed Workers (doc-link-checker).
Plan mutates a shared symbol (state enum, gameplay tag, public field, exported function signature)?
→ Add a reverse-reference scan subsection to the plan listing every consumer. See docs/wiki/writing-plans.md § Shared-State Pre-Flight Gate.
Cross-plan conflict scan run? (mandatory before dispatch)
→ Grep docs/plans/*.md for each chunk-scope file path AND for each new abstraction / registry entry / hookspec / schema field the plan introduces. Fold findings into a ## Cross-plan coordination section: enumerate each sibling plan touched, what assumption it carries, and whether this plan amends / defers to / supersedes it. No conflicts → write the section anyway with scanned — no overlapping file scope or seam citations. Missing section is the failure mode this row exists to prevent. See docs/wiki/writing-plans.md § (c) Cross-plan reconciliation — Cross-plan conflict scan procedure.
Plan amends an assumption that another live plan also depends on? (the current plan revises a path / contract / constant / sequencing decision that one or more sibling plans in docs/plans/ reference — by **Depends on:** header, shared-symbol citation, or explicit cross-reference)
→ Edit the body of every affected sibling plan in this same change — do not let sibling plans silently drift. Procedure: (1) grep docs/plans/ for references to the amended assumption (path, constant, contract name); (2) for each hit, open the sibling plan and edit the body inline so the assumption matches the new shape; (3) add a one-line amendment note at the top of each edited sibling: **Amended <YYYY-MM-DD> by <this-plan-slug>:** <one-line change>; (4) commit the amending plan and all edited siblings together. Silent drift is the failure mode this row exists to prevent — a sibling plan that still cites the old shape will be dispatched against stale substrate. See docs/wiki/writing-plans.md § (c) Cross-plan reconciliation is a separate pass.
Plan supersedes another plan or its seam? (the new plan declares supersedes: / predecessor_plan:, or replaces a chunk/AC of a sibling plan wholesale — distinct from amending a shared assumption above)
→ Append a one-line back-notification to the top of the superseded plan in the same commit: **Superseded <YYYY-MM-DD> by <this-plan-slug>:** <reason>. This rides the sibling-amendment pass above — no new automation. The distinct **Superseded…** token (vs **Amended…**) is deliberate: amend = a sibling's assumption shifted in place; supersede = the plan/seam is replaced wholesale — two lifecycle events the original session must be able to tell apart. The note is a backstop signal the original session sees at next /workstream-start orient; it does NOT prevent same-session HEAD-drift discovery (which arrives sooner in a fast collision). Closes the realization-layer back-notification gap (2026-06-23 holodeck B3: Session A learned of the takeover only via HEAD drift). See skills/pickup/SKILL.md § Routed-plan reconcile-and-surface; the source_memo: collision check in B.0 above is the upstream prevention.
Plan scaffolds a new autonomous skill / agent / command?
→ Apply the skill-scaffold checklist before drafting the body: (1) destructive-action prohibition block (see docs/wiki/coordinator-tripwires.md — Destructive-action prohibition in autonomous-dispatch prompts) for any write-capable autonomous skill; (2) explicit out-of-scope list; (3) spinoff-schema awareness if the skill can author handoffs (kind / predecessor / deployment_state fields per docs/wiki/spinoff-handoffs.md); (4) recheck-marker semantics if the skill has a cadence (recheck-due files per coordinator:learn-lessons mode recheck); (5) discovery-surface integration (where does this skill announce itself — /workstream-start mention, /workday-start surfacing, hook integration?); (6) platform-vocabulary collision check on the invokable name — an invokable skill/command verb can collide with evolving Claude Code platform vocabulary (native command names, harness primitives). Grep the proposed verb against the platform's command/primitive surface before shipping it; a collision forces a confusing skill→methodology demotion later (/fan-out collided with native vocab 3 days post-ship, 2026-05-30). Prefer a name with no native-primitive twin. Empirical: bug-blitz the Staff Engineer R1 caught 5 majors on a skill scaffolded without this pass; the checklist exists because the failure mode is recurring. See CLAUDE.md § Adding a Convention to the Coordinator System for the contact-point enumeration shape.
Plan contains a chunk that authors a handoff, spinoff, or workstream-complete artifact?
→ Reject the chunk. Handoffs (/handoff), spinoffs (/spinoff), and workstream-complete captures (/workstream-complete) are PM-gated session-continuity artifacts, not plan deliverables. A plan that pre-authorizes "Chunk N: write a spinoff to <topic>" launders the PM gate through plan approval — by execution time, the EM treats it as a checklist item and the spinoff's Step 0 gate never fires. Two failure shapes this row prevents: (a) the plan's terminal chunk is "author handoff" used as a wrap-up ceremony when commit-and-stop or /workday-complete is the right artifact; (b) the plan's terminal chunk is "author spinoff to <other-EM>" used as cross-repo messaging when the actual primitive is PM-as-relay (copy-paste in chat, or use cross-repo-memo --to <receiver-em> --topic <slug> for structured briefs). If the plan genuinely needs cross-EM coordination, the chunk is "surface cross-repo brief to PM" with the brief composed inline or sent via cross-repo-memo. See docs/wiki/cross-repo-communication.md.
Plan brief contains code blocks (shell, Python, config) the executor will consume?
→ Mark every fenced block either TEMPLATE (illustrative — executor adapts paths/values) or VERBATIM (executor copies as-is). Convention: place a fenced comment above the block, e.g. <!-- TEMPLATE: adapt paths --> or <!-- VERBATIM -->. Unmarked pseudocode-shaped bash gets faithfully transcribed into broken shell — the convention is the fix.
coordinator:reviewCondition: plan body drafted, saved to docs/plans/YYYY-MM-DD-<slug>.md, ready for review.
Enforcement check: the plan file MUST have been scaffolded via coordinator-doc-new --type plan before body authoring. Frontmatter is schema-derived, not hand-authored — the generator is the source of truth for which keys are required and their default values. If the frontmatter was hand-authored, conform it now:
coordinator-doc-new --type plan --title "<title>" --out docs/plans/YYYY-MM-DD-<slug>.md
The scaffolder derives its output from schemas/plan.yaml (tc-0 GENERATE-altitude doctrine — kills required-key drift and section-ordering skew at the source). Do not hand-author the frontmatter block.
Commit the plan at write-time, before invoking review. A plan saved to docs/plans/YYYY-MM-DD-<slug>.md but left untracked nearly escapes the audit trail — lazy commit at /workstream-complete is the failure mode this rule prevents (2026-05-20: an untracked plan was almost lost at workstream-complete). Stage and commit the plan doc with an explicit-path commit (git add -- docs/plans/<slug>.md && git commit -m "plan(<slug>): draft" -- docs/plans/<slug>.md) the moment the body is drafted and saved, then proceed to review. The plan is now in git history before any reviewer or executor touches it; review findings integrate as follow-up commits. The explicit-path form follows the scoped-commit baseline — see scoped-safety-commits.md (and CLAUDE.md § Concurrent-EM Git Operations: "Scoped commits default to plain git add -- <paths> && git commit -m "<subject>" -- <paths>. Never git add -A / git add ."); this is that established practice applied at write-time rather than workstream-complete, NOT a license for a sweep commit — the explicit-path scoping to the single plan doc is the point. (This is the plan-author's own commit of the plan doc — distinct from, and not to be confused with, the review-integrator's commit-after-integrate discipline, which governs integrated review findings.)
→ Invoke coordinator:review immediately. Do not ask the PM whether to proceed to review — plan→review is the pipeline, not a checkpoint. If the plan was worth formally writing, it is worth formally reviewing; the gating on review-or-not happens inside coordinator:review Branch A (Branch A.2 carries the auto-skip terminals for genuinely-trivial / PM-waived). Pausing to ask "want me to invoke review now?" is a doctrine violation — the answer is always yes, and the auto-skip path lives downstream.
Reviewer altitude is binary: named Opus persona, or no review. Plan review is an Opus-persona judgment task (the Staff Engineer / the Game Dev Reviewer / the Director of Engineering / the Data Science Reviewer / the Front-End Reviewer / the UX Reviewer). There is no Sonnet-tier plan reviewer, and code-reviewer is not one — it is the Sonnet diff reviewer (its own scope is "weak tests, dead code, unclear naming, correctness/security issues" on a frozen diff). Reaching for code-reviewer because "the Staff Engineer feels heavy for this plan" is the failure mode this row prevents. The correct fork is: plan merits review → named persona; plan does not merit review → skip review, implement, let code-reviewer catch issues on the diff at /workstream-complete or /handoff. Sonnet-on-plan-body is not on the menu.
The full plan-writing pipeline is: (1) substrate verification (Branch B above), (2) body composition with the four PM doctrinal lenses (Branch C above), (3) docs-checker / prior-art-checker / plan-coverage-checker pre-flights via coordinator:review, (4) named reviewer (Opus persona), (5) review-integrator. Skipping coordinator:plan skips the pipeline; "I'll just write the plan and skip review", "let me ask first before invoking review", and "I'll send this to code-reviewer instead of the Staff Engineer" are the three failure modes this skill exists to prevent.
Condition: a dispatched executor returns BLOCKED citing substrate that differs from what the plan asserted (path moved, helper renamed, framework changed, contract field absent, schema column missing).
coordinator:plan to amend (small drift, same workstream) or compose a successor (larger drift or shape change). Re-run the prior-art-checker → the Staff Engineer → review-integrator chain on the amended body — the pipeline runs again from substrate verification, not from "we already reviewed the parent." Silently expanding the executor's scope to make the BLOCKED finding go away is a doctrine violation: it bypasses the doctrinal lenses, the prior-art check, and the reviewer pass that the original plan went through./autonomous, surface product-risk findings via AskUserQuestion before amending. The autonomous mode suppresses handoff nudges, not product judgment. A BLOCKED that reveals (e.g.) a privacy implication, a permission default change, or an external contract shift is exactly the case the "Ask the PM" doctrine covers — autonomous mode does not waive it.Condition: drafting is in progress and something is going sideways.
docs/wiki/stuck-detection.md for the pattern catalog and recovery protocol.docs/wiki/systematic-debugging.md for the four-phase root-cause process.tools
Orient session — preflight, load context, choose work
documentation
Wrap up finished work — capture lessons, update docs
testing
Use at cadence gates or to validate repo state. Resolves and runs the project's configured fast-test command.
development
Root-cause discipline for ONE identified bug, test failure, or unexpected behavior — pin the premise, reproduce, trace to source, fix at source, verify. For a single known issue, not a codebase sweep.