Execute a PM-approved implementation plan directly in the coordinator session
npx skillsauth add oduffy-delphi/coordinator-claude execute-planInstall this skill globally with one command. Works with Claude Code, Cursor, and Windsurf.
3 of 9 scanners reported clean
Some scanners were skipped, did not run, or reported a non-clean status. Review each row below.
Run a PM-approved implementation plan to completion without stopping for permission between tasks. The PM's approval of the plan is the authorization — this command executes it diligently and in its entirety, commits the work, and reports. It does not chain into branch disposition (merge / PR / keep): finishing a development branch involves the PM-gated /merge-to-main and is a separate decision. The natural next step after a plan is executed is /workstream-complete (cap the workstream — lessons, docs, workstream-complete review), which execute-plan offers but does not auto-invoke. See Phase 4.
Core principle: Write-ahead every task (both plan document on disk AND task list via TaskUpdate), execute autonomously, stop only when your judgment says the plan itself is in trouble — not when a task is merely hard.
Stance — execute = restructure-then-dispatch. Executing a plan is not "type the plan's steps." It is: read the plan, build the dispatch-gate graph (Phase 1.5), and then decompose into per-chunk dispatches — one executor per chunk, fanned out in parallel where the gates allow and run in sequence where they don't. Decomposition is unconditional; parallelism is only the time-overlap axis. A serial chain is still N dispatches (a fresh agent per chunk, EM-verify between), never one long-lived executor walking the chain — that bundling is the failure this skill exists to prevent. This whole shape is the fan-out methodology execution follows (docs/wiki/dispatching-parallel-agents.md § Executing a Fan-Out Wave), not a separate command, and it governs serial waves as much as parallel ones (serial = depth-1 cohorts). Execution owns the judgment of restructuring the plan into the right wave shape; fan-out owns the mechanical dispatch underneath. The default outcome of executing is a dispatched wave.
Self-execute vs. dispatch is a token-economics call, not a vibe. A Sonnet executor burns ~¼ the tokens of an Opus EM doing the same edits, and finishes faster — so dispatch wins on the axis that matters almost every time, and self-executing inline is the rare carve-out, justified only when you can name why it is genuinely cheaper here (loci already loaded, tight cross-file coherence on a small surface). Ground that against the When to EM-Inline checklist in docs/wiki/agent-dispatch-economics.md; the full criterion lives at Phase 1.5 § Self-execute escape hatch. If the plan contains enriched stubs with known file paths, exact line numbers, and code sketches, the dispatch is even cheaper — fan out Sonnet executors per docs/wiki/delegate-execution.md.
$ARGUMENTS is the path to the plan document to execute — e.g., tasks/my-feature/todo.md or an absolute path. The file must be readable and contain a structured implementation plan.
If no path is provided, report: "Usage: /execute-plan <plan-path>. Provide the path to the plan document you want to execute." and stop.
$ARGUMENTS in full/execute-plan to implement this plan." and continue to Phase 1.5.This phase is the EM's named responsibility at the seam between plan-approved and first executor dispatch. It applies whether execution is direct (Phase 3 of this skill) or via dispatched executors per docs/wiki/delegate-execution.md — the gate-graph is identical in either case; only the executor identity differs.
Three real gate types determine what can run concurrently vs. must be serial (narrative causality, aesthetic ordering, and "I'd rather review A before B" are NOT gates):
Output-consumption and contract-change gate verification, not authoring. When B's only dependency on A is consuming its output or contract, B can be authored concurrently with A if the interface is pinned (the full signature written down, precise enough to author against without asking the producer) — only B's green-verification waits for A to land. File-write overlap is the sole unconditional serial gate. Default to concurrent-with-pinned-interface, verify-at-merge: pin the interface, fan out producer + consumers in one wave, verify at merge (at agent speed, per-dispatch serialization outweighs the occasional merge-point mismatch). Hard gate: no pinnable interface → no concurrent authoring. Fall back to the predecessor-wave shape only when the interface can't be confidently pinned, or per-chunk blast-radius isolation is worth the serialization on a high-stakes surface.
→ Full taxonomy and rationale: docs/wiki/dispatching-parallel-agents.md § Dispatch-Gate Taxonomy (incl. Author vs. verify) and § Peer-Scope Prohibition in Parallel-Wave Prompts.
EM-judgment step 1 — Gate-type discrimination (helper cannot do this): Classify every task-pair relationship as one of the three gate types above, or as truly independent. The helper detects file-write overlap automatically; output-consumption and contract-change dependencies require EM reading the plan's per-task scope. Do not outsource this classification — the helper sees file paths, not semantic contracts.
EM-judgment step 2 — Budget-sizing (helper cannot do this): Aim for ~5–10 min per executor on a single coherent surface, 15 min hard ceiling. Rule of thumb: a series of small-remit executors beats one executor with a large remit — in parallel where the gates allow, in sequence where they don't. The budget axis is orthogonal to the parallelism gates above: file-overlap answers can these run concurrently, NOT how many dispatches. When overlap (or output-consumption, or contract-change) forces serial execution, walk each serial position and apply the budget check independently — "can't parallelize" ≠ "one dispatch." Over-budget coupled work chunks into a fresh agent per chunk (dispatch B2 → EM verifies → dispatch fresh C1 → EM verifies → dispatch fresh C2/D), never one agent handed chunk after chunk. One long-lived agent grinding a sequence is the overload in slow motion — context accumulation, growing blast radius, degrading judgment. → docs/wiki/dispatching-parallel-agents.md § Coupling Rules Out Concurrency, Not Decomposition.
Mechanical step — follow the fan-out methodology: Once gate-type discrimination and budget-sizing are done, follow the canonical fan-out methodology at docs/wiki/dispatching-parallel-agents.md § Executing a Fan-Out Wave. Fan-out is a methodology execution follows, not a skill to invoke — there is no /fan-out command. This Phase 1.5 is the plan-mediated entry to that methodology.
Compile the wave spec (one TSV row per chunk: <chunk-id>\t<brief>\t<comma-separated-files>) from the gate-graph analysis above, then walk the methodology's steps: Step 0.5 fan-out suitability gate (HARD STOP — re-chunk any fat chunk before dispatch), Step 1 run fan-out-dispatch.sh for the overlap pass + scoped-prompt compilation (hard-stop on collision), Step 2 organic ramp, Step 3 dispatch the compiled blocks via Agent (mode: "acceptEdits", all concurrent), Step 4 EM-serial commit. Do NOT duplicate wave-map logic here — the helper + the wiki methodology are the single source for that ceremony.
Self-execute escape hatch — gated on token-economics, not vibe. The default is to dispatch: a Sonnet executor burns roughly a quarter of the tokens an Opus EM would on the same edits, and finishes faster, so dispatch is cheaper on the axis that matters almost every time. Self-execute (the EM runs Phase 3's tasks inline instead of dispatching) only when you can articulate why it is genuinely cheaper here — e.g. the loci are already loaded in your context and re-loading them into N executors would cost more than typing, or cross-file coherence across a small surface is the dominating constraint. Ground that articulation against the concrete When to EM-Inline checklist in docs/wiki/agent-dispatch-economics.md (fix-locus ≤3 files / <60s on a >30k-file repo / mechanical / context-already-loaded / mid-edit-hazard) — "articulably cheaper" is self-graded by the same agent that wants to skip the work, so the checklist is the guard against rationalizing it. Self-execute is the one path that skips the Step 0.5 suitability gate (the EM holds the gate in its own judgment instead), so the bar is high. The gate-graph still applies either way — it sequences Phase 3's tasks even when one executor (the EM) runs them all. Self-executed chunks still appear in the Phase 1.6 ledger as inline (EM) rows — one row per chunk, never a bundle.
Before issuing any Agent call, WRITE a dispatch ledger INTO the plan document on disk — a ## Dispatch Ledger section, one row per chunk from the Phase 1.5 gate graph. This is a disk write, not a chat emission. A ledger narrated to chat is ephemeral and the EM can rationalize around it mid-flow; a ledger written into the plan file is the contract the EM dispatches against — crash-durable, PM-visible, and re-readable after compaction. It is the same write-ahead discipline as Phase 3a, applied to the dispatch decomposition. The failure it prevents: the EM narrates an intent ("I'll delegate the chunker to a focused executor") and then silently bundles several gate-graph chunks into one open-ended dispatch because they happen to be serial. A ledger on disk makes that bundle visibly malformed before it is dispatched — and keeps it malformed where chat scrollback would have buried it.
Edit the plan document (the file at $ARGUMENTS) to add:
## Dispatch Ledger
| dispatch # | chunk-id | one-line brief | write-files | runs | est-min | status |
|---|---|---|---|---|---|---|
| 1 | … | … | … | inline (EM) / parallel / after #N | … | pending |
The invariant — one chunk per row, one chunk per dispatch: the number of distinct dispatch-numbers (counting inline (EM) rows) equals the number of chunks. If any single dispatch number spans more than one chunk-id, the ledger is malformed — STOP and split before dispatching. "These chunks are serial, so one executor can just walk them in order" is the exact rationalization this gate rejects: serial coupling removes concurrency, never decomposition (Phase 1.5 EM-judgment step 2; wiki § Coupling Rules Out Concurrency).
runs column records each row's gate: parallel (same wave), after #N (serial — a fresh agent that fires only after dispatch #N has landed and the EM has verified it on disk), or inline (EM) (the token-economics self-execute carve-out).est-min > 15 on any row → re-split that chunk before dispatch. The per-executor ceiling is 15 min on one coherent surface; aim for 5–10.after #1, after #2, …) — each a fresh agent on a clean context with EM verify-and-commit between, never one long-lived executor. This still routes through the fan-out methodology's Step 0.5 suitability gate (serial just means depth-1 cohorts); do not read a serial gate graph as an exemption from the methodology.status column is write-ahead state, updated on disk as Phase 3 proceeds: pending → dispatched → verified → committed. Edit the row in place at each transition — the same crash-insurance Edit Phase 3a does for task state. A post-compaction or post-crash agent re-reads this table to see exactly which chunks shipped and which are still owed.Runtime tripwire — the EM owns the clock. If any dispatched executor runs past ~15 min wall-clock, that is a dispatch-sizing failure surfacing late: stop it, recover partial work from disk (it persists — shared working tree), and re-split into fresh per-chunk dispatches (add the split rows to the ledger on disk). Do not wait for it to finish, and do not wait for the PM to flag the runaway — a single executor at 20+ min is prima facie evidence the chunk was too big.
Create a task list (TaskCreate) for this execution session:
in_progress immediately via TaskUpdateThis flight recorder is your compaction insurance — tasks persist through compaction by design. Keep it current throughout execution.
Default behavior: execute every task in sequence without stopping to ask permission.
For each task in the plan:
Update BOTH:
In progress (started YYYY-MM-DD HH:MM). Edit the file directly. This is crash insurance — if the session dies, the plan shows where execution stopped.in_progress via TaskUpdateUpdate BOTH:
Complete (YYYY-MM-DD HH:MM)completed via TaskUpdateMove immediately to the next task. Do NOT pause to ask "should I proceed?" or "ready for feedback?" — brief status updates at natural milestones are fine ("Phase 2 complete, moving to Phase 3"), but these are informational, not permission requests.
Stop executing and consult the PM when, in your best judgment, there is genuine cause:
When you stop: Record in both the plan document AND the relevant task's metadata.tried_and_abandoned field (via TaskUpdate) what approach was tried and why it failed. Format: "Tried: [approach] — Failed: [reason]". This prevents a future session from retrying the same dead end.
Do NOT stop for:
After all tasks are complete and verified. Execute-plan ends here — it does not chain into branch disposition. Implementing a plan is EM-remit engineering work; deciding what happens to the branch (merge / PR / keep) reaches the PM-gated /merge-to-main and is a separate, PM-invoked decision. Auto-chaining plan-execution into that flow would structurally drive every plan toward a gate the EM cannot fire — the conflict this phase exists to avoid.
Run the acceptance oracle as early advisory feedback. The plan path is $ARGUMENTS (the plan document this skill was invoked with).
bash check-acceptance-oracle.sh "$ARGUMENTS"
This gate is advisory only at this surface — the authoritative gate is at coordinator:merging-to-main Step 0a. Do NOT hard-block here regardless of exit code.
Commit any uncommitted work with a scoped, explicit-path commit (plain git add -- <paths> && git commit, per the concurrent-EM commit doctrine). Commits are EM-remit quick-saves; don't ask permission to commit.
Report completion — what landed, the acceptance-oracle verdict from Phase 4a, and the branch the work is committed on.
Offer the natural next step as an offer, not an auto-invocation:
Plan executed and committed on
<branch>. The natural next step is/workstream-completeto cap the workstream (lessons, docs, workstream-complete review). When you want to ship it,/merge-to-mainor/workday-completecarries the branch to main.
Do not invoke /workstream-complete, /merge-to-main, /workday-complete, or coordinator:finishing-a-development-branch automatically. /merge-to-main is keyword-gated (the PM invokes it by name); /workstream-complete vs /handoff vs /workday-complete depends on workstream state, which the PM picks. Naming the affordance keeps it discoverable without firing it — design-as-offers.
| Situation | Action |
|---|---|
| Multiple gate-graph chunks about to go to one executor | Malformed ledger (Phase 1.6) — STOP, one chunk per dispatch, split before dispatching |
| A dispatched executor runs past ~15 min wall-clock | Dispatch-sizing failure — stop it, recover partial work from disk, re-split into fresh per-chunk dispatches; don't wait for it or for the PM to flag it |
| Plan path not provided | Report usage and stop |
| Plan file not found | Report the path that was tried and stop |
| Plan has no concerns but looks unreviewed | Surface the observation; proceed only if PM confirms |
| Task fails with fixable error (type error, import, lint) | Fix immediately, continue |
| Task fails with structural error after 2 attempts | Stop, record what was tried, consult PM |
| Verification step in plan fails | Stop and report — do not skip verifications |
| Plan's approach is invalidated mid-execution | Stop, record Tried/Failed, flag for PM to update plan |
| Tests fail at Phase 4 | Report failures in the completion report; do not offer /workstream-complete as a clean next step until they're green. Fix routine failures and re-run; stop and consult the PM on structural failures |
docs/wiki/dispatching-parallel-agents.md § Executing a Fan-Out Wave) — the dispatch ceremony execution follows, not a skill (the /fan-out command was demoted 2026-05-30; the verb collided with native Claude Code vocabulary). Phase 1.5 is the plan-mediated entry to it; ad-hoc parallel work (≥2 tasks, no plan doc) follows the same methodology inline. Stance: execute = restructure-then-dispatch; fan-out = the dispatch methodology.docs/wiki/delegate-execution.md) — the model-selection rubric for the executors a fan-out dispatches; use when the plan consists of enriched stubs with exact code sketches, file paths, and line numbers. Dispatch is the default; self-execute inline only on the token-economics carve-out (see Phase 1.5 § Self-execute escape hatch)./enrich-and-review — should be run before executor dispatch; not required before /execute-plan (plans that route here are typically less chunked)./review-code — optional post-execution code quality pass on the implemented work. If the plan called for it, route through /review-code before reporting completion in Phase 4b.coordinator:plan — creates the plan that this command executes. A plan produced by that skill is the ideal input here.coordinator:workstream-complete — the natural next step after a plan is executed, offered (not auto-invoked) in Phase 4b. Caps the workstream: lessons, docs, workstream-complete review.coordinator:finishing-a-development-branch — not chained from here. Branch disposition (merge / PR / keep) is a separate, PM-invoked decision that reaches the keyword-gated /merge-to-main. The PM invokes it directly when ready to ship.tools
Orient session — preflight, load context, choose work
documentation
Wrap up finished work — capture lessons, update docs