skills/business/operations/SKILL.md
Business operations: vendor management, runbooks, process docs, risk assessment, capacity planning, change management, compliance tracking.
npx skillsauth add notque/claude-code-toolkit operationsInstall this skill globally with one command. Works with Claude Code, Cursor, and Windsurf.
3 of 9 scanners reported clean
Some scanners were skipped, did not run, or reported a non-clean status. Review each row below.
Umbrella skill for business operations: vendor management, runbooks, process documentation, risk assessment, capacity planning, change management, compliance tracking, status reporting, and process optimization. Each mode loads its own reference files on demand.
Scope: Operational workflows that keep the business running. Use csuite for strategic decisions, finance for budgeting/forecasting, and hr for people operations.
Classify the request into exactly one mode. If it spans multiple, choose the primary and note the secondary.
| Mode | Signal Phrases | Reference |
|------|---------------|-----------|
| RUNBOOK | runbook, procedure, on-call, playbook, step-by-step, ops task | references/runbook-authoring.md |
| RISK | risk assessment, risk register, what could go wrong, risk matrix | references/risk-assessment.md |
| VENDOR | vendor review, vendor evaluation, contract review, procurement | references/vendor-management.md |
| PROCESS | process doc, SOP, RACI, workflow documentation, process map | references/process-documentation.md |
| CHANGE | change request, change management, CAB, rollout, deployment change | references/change-management.md |
| CAPACITY | capacity plan, resource allocation, utilization, headcount planning | references/process-documentation.md |
| COMPLIANCE | compliance, audit prep, SOC 2, ISO 27001, GDPR, regulatory | references/risk-assessment.md |
| STATUS | status report, weekly update, project health, KPIs | (no deep reference needed) |
| OPTIMIZE | process improvement, bottleneck, streamline, too many steps | references/process-documentation.md |
Always load references/llm-ops-failure-modes.md regardless of mode. It contains the failure patterns that apply across all operations work.
Framework: SCOPE -> AUTHOR -> VERIFY
Phase 1: SCOPE -- Define what the runbook covers.
Gate: Task named. Prerequisites listed. Trigger defined.
Phase 2: AUTHOR -- Write the procedure with painful specificity.
Load references/runbook-authoring.md.
Critical rules:
python sync.py --prod --dry-run from /opt/ops/ as deploy-user IS a step| Step Component | Required | Example |
|---------------|----------|---------|
| Action | Yes | kubectl rollout restart deployment/api -n production |
| Expected result | Yes | "Pods restart within 60s. kubectl get pods shows 3/3 Running." |
| Failure handling | Yes | "If pods stay in CrashLoopBackOff >2min, proceed to Rollback." |
| Verification | Yes | curl -s https://api.example.com/health | jq .status returns "ok" |
| Rollback | Per-step | kubectl rollout undo deployment/api -n production |
Gate: Every step has all five components. Rollback procedure exists. Escalation path defined.
Phase 3: VERIFY -- Validate the runbook is actually usable.
Gate: All steps self-contained. No implicit knowledge. Troubleshooting table complete.
Framework: IDENTIFY -> ASSESS -> MITIGATE
Phase 1: IDENTIFY -- Enumerate risks systematically by category.
Load references/risk-assessment.md.
| Category | What to Look For | |----------|-----------------| | Operational | Process failures, staffing gaps, system outages, single points of failure | | Financial | Budget overruns, vendor cost increases, revenue impact, currency exposure | | Compliance | Regulatory violations, audit findings, policy breaches, certification gaps | | Strategic | Market changes, competitive threats, technology shifts, dependency risks | | Reputational | Customer impact, public perception, partner relationships, data incidents | | Security | Data breaches, access control failures, third-party vulnerabilities |
Gate: Risks enumerated across all applicable categories. Each risk has a clear description.
Phase 2: ASSESS -- Score each risk on probability and impact.
Apply the probability x impact matrix:
| | Low Impact | Medium Impact | High Impact | |---|-----------|---------------|-------------| | High Probability | Medium | High | Critical | | Medium Probability | Low | Medium | High | | Low Probability | Low | Low | Medium |
For each risk:
Gate: Every risk scored. No unquantified "High" without supporting rationale.
Phase 3: MITIGATE -- Plan mitigations and track residual risk.
For each High/Critical risk:
Gate: All High/Critical risks have mitigations with owners and dates. Residual risk documented.
Framework: EVALUATE -> SCORE -> RECOMMEND
Phase 1: EVALUATE -- Gather structured information.
Load references/vendor-management.md.
Required inputs:
Due diligence checklist (minimum):
Gate: Due diligence complete. Contract terms reviewed. Red flags documented.
Phase 2: SCORE -- Apply the vendor scorecard.
| Dimension | Weight | Score (1-10) | |-----------|--------|-------------| | Functional fit | 5x | | | Total cost of ownership | 4x | | | Integration complexity | 4x | | | Support quality | 3x | | | Security/compliance | 3x | | | Data portability | 3x | | | Company stability | 2x | | | Contract flexibility | 2x | |
TCO must include: license, implementation, training, support, ongoing maintenance, exit costs. License price alone is not TCO.
Gate: All dimensions scored with rationale. TCO calculated for Year 1 and Year 3.
Phase 3: RECOMMEND -- Deliver verdict with negotiation points.
Gate: Recommendation stated. Negotiation points listed. Monitoring plan defined.
Framework: MAP -> DOCUMENT -> OPTIMIZE
Phase 1: MAP -- Capture how the process actually works today.
Load references/process-documentation.md.
Gate: Current state mapped. All steps, handoffs, and exceptions documented.
Phase 2: DOCUMENT -- Produce the SOP.
Structure:
RACI rules:
Gate: SOP complete. RACI has exactly one A per step. Exceptions documented.
Phase 3: OPTIMIZE -- Identify improvement opportunities.
Gate: Bottlenecks identified. Recommendations specific and measurable.
Framework: ASSESS -> PLAN -> EXECUTE
Phase 1: ASSESS -- Define the change and its impact.
Load references/change-management.md.
Gate: Change defined. Impact assessed by area. Risks identified.
Phase 2: PLAN -- Build the implementation and communication plan.
| Plan Component | Required Elements | |---------------|-------------------| | Implementation | Steps, owners, timeline, dependencies | | Communication | Audience, message, channel, timing | | Training | What skills needed, delivery method, timeline | | Rollback | Trigger criteria, steps, verification | | Approval | Who approves, role, current status |
Communication rules:
Gate: All plan components complete. Rollback plan has trigger criteria. Approvals identified.
Phase 3: EXECUTE -- Monitor adoption and sustain.
Gate: Adoption metrics defined. Lessons captured. Success criteria measurable.
Framework: INVENTORY -> FORECAST -> DECIDE
Phase 1: INVENTORY -- Map current capacity.
| Role Type | Target Utilization | Rationale | |-----------|-------------------|-----------| | IC / Specialist | 75-80% | Buffer for reactive work and growth | | Manager | 60-70% | Management overhead, 1:1s, meetings | | On-call / Support | 50-60% | Interrupt-driven work is unpredictable |
Gate: Current capacity mapped. Utilization calculated. Overallocations identified.
Phase 2: FORECAST -- Model upcoming demand.
Gate: Demand mapped. Bottlenecks identified. Scenarios modeled.
Phase 3: DECIDE -- Recommend action.
Gate: Recommendation stated. Trade-offs explicit. Buffer preserved.
Framework: MAP -> GAP -> REMEDIATE
Phase 1: MAP -- Identify applicable frameworks and current state.
| Framework | Focus | Key Requirements | |-----------|-------|-----------------| | SOC 2 | Service organizations | Security, availability, processing integrity, confidentiality, privacy | | ISO 27001 | Information security | Risk assessment, security controls, continuous improvement | | GDPR | Data privacy (EU) | Consent, data rights, breach notification, DPO | | HIPAA | Healthcare (US) | PHI protection, access controls, audit trails | | PCI DSS | Payment card data | Encryption, access control, vulnerability management |
Gate: Frameworks identified. Controls inventoried.
Phase 2: GAP -- Find what is missing or deficient.
Load references/risk-assessment.md for risk-based prioritization of gaps.
Gate: Gaps identified and prioritized. Evidence gaps documented.
Phase 3: REMEDIATE -- Plan and track closure.
Gate: Remediation plan complete. Audit calendar set. Owners assigned.
Framework: GATHER -> SYNTHESIZE -> DELIVER
Produce a status report covering:
| Section | Content | |---------|---------| | Executive Summary | 3-4 sentences. What is on track, what needs attention, key wins. | | Overall Status | On Track / At Risk / Off Track with justification | | Key Metrics | KPI, target, actual, trend, status | | Accomplishments | What got done this period | | In Progress | Item, owner, status, ETA | | Risks and Issues | Risk, impact, mitigation, owner | | Decisions Needed | Decision, context, deadline, recommendation | | Next Priorities | Top 3 for next period |
Rules:
Framework: MAP -> ANALYZE -> REDESIGN
Phase 1: MAP -- Document current state with timing.
Load references/process-documentation.md.
Phase 2: ANALYZE -- Identify waste.
| Waste Type | What to Look For | |-----------|-----------------| | Waiting | Time in queues, waiting for approvals | | Rework | Steps that fail and repeat | | Handoffs | Each handoff = potential failure/delay point | | Over-processing | Steps that add no value | | Manual work | Tasks that could be automated |
Phase 3: REDESIGN -- Propose improvements.
| Error | Cause | Solution | |-------|-------|----------| | Vague runbook steps | LLM defaults to abstract language | Force each step through the 5-component template. Reject steps without exact commands. | | Underestimated risk | Optimism bias in probability scoring | Challenge every "Low" probability. Ask: "What evidence supports Low, not Medium?" | | Generic process docs | Template fill without reality check | Ask how the process actually works today, not how it should work. | | Missing rollback | Assumed success path only | Require rollback before marking any change/runbook complete. | | Scorecard inflation | All vendors score 7+ | Force relative scoring. At least one dimension per vendor must be below 5. | | RACI with multiple As | Accountability diffusion | Enforce exactly one A per step. Multiple As = no one accountable. | | Compliance checkbox theater | Controls documented but not tested | Require evidence of control effectiveness, not just existence. |
| Mode | Reference | Content |
|------|-----------|---------|
| RUNBOOK | references/runbook-authoring.md | Step structure, verification checklists, rollback procedures, escalation paths |
| RISK, COMPLIANCE | references/risk-assessment.md | Probability x impact matrix, risk categories, mitigation planning, residual risk tracking |
| VENDOR | references/vendor-management.md | Vendor scorecard, due diligence checklist, contract review triggers, performance monitoring |
| PROCESS, CAPACITY, OPTIMIZE | references/process-documentation.md | Process mapping, RACI matrices, bottleneck analysis, optimization methodology |
| CHANGE | references/change-management.md | Change request workflows, impact assessment, stakeholder communication, rollback criteria |
| ALL | references/llm-ops-failure-modes.md | LLM failure patterns in operations: vague procedures, underestimated risks, generic templates |
tools
Shell configuration: Fish and Zsh setup, PATH, completions, plugins.
tools
Kubernetes operations: debugging, security, RBAC, and infrastructure tooling.
development
Swift development: concurrency patterns, async/await, actors, testing with XCTest and Swift Testing framework.
development
PHP development: code quality, PSR standards, testing with PHPUnit.