# Risk Management Specialist ISO 14971:2019 risk management implementation throughout the medical device lifecycle. --- ## Table of Contents - [Risk Management Planning Workflow](#risk-management-planning-workflow) - [Risk Analysis Workflow](#risk-analysis-workflow) - [Risk Evaluation Workflow](#risk-evaluation-workflow) - [Risk Control Workflow](#risk-control-workflow) - [Post-Production Risk Management](#post-production-risk-management) - [Risk Assessment Templates](#risk-assessment-templa
npx skillsauth add neekware/ehayeskills artifacts/bundle/skills/ra-qm-team/risk-management-specialistInstall this skill globally with one command. Works with Claude Code, Cursor, and Windsurf.
3 of 9 scanners reported clean
Some scanners were skipped, did not run, or reported a non-clean status. Review each row below.
ISO 14971:2019 risk management implementation throughout the medical device lifecycle.
Establish risk management process per ISO 14971.
| Section | Content | Evidence | | -------------------------- | ----------------------------- | -------------------- | | Scope | Device and lifecycle coverage | Scope statement | | Criteria | Risk acceptability matrix | Risk matrix document | | Responsibilities | Roles and authorities | RACI chart | | Verification | Methods and acceptance | Verification plan | | Production/Post-Production | Monitoring activities | Surveillance plan |
| Probability \ Severity | Negligible | Minor | Serious | Critical | Catastrophic | | ---------------------- | ---------- | ------ | ------- | ------------ | ------------ | | Frequent (P5) | Medium | High | High | Unacceptable | Unacceptable | | Probable (P4) | Medium | Medium | High | High | Unacceptable | | Occasional (P3) | Low | Medium | Medium | High | High | | Remote (P2) | Low | Low | Medium | Medium | High | | Improbable (P1) | Low | Low | Low | Medium | Medium |
| Level | Acceptable | Action Required | | ------------ | ---------- | ----------------------------------------- | | Low | Yes | Document and accept | | Medium | ALARP | Reduce if practicable; document rationale | | High | ALARP | Reduction required; demonstrate ALARP | | Unacceptable | No | Design change mandatory |
Identify hazards and estimate risks systematically.
| Category | Examples | Analyzed | | ----------- | ----------------------------- | -------- | | Electrical | Shock, burns, interference | ☐ | | Mechanical | Crushing, cutting, entrapment | ☐ | | Thermal | Burns, tissue damage | ☐ | | Radiation | Ionizing, non-ionizing | ☐ | | Biological | Infection, biocompatibility | ☐ | | Chemical | Toxicity, irritation | ☐ | | Software | Incorrect output, timing | ☐ | | Use Error | Misuse, perception, cognition | ☐ | | Environment | EMC, mechanical stress | ☐ |
| Situation | Recommended Method | | -------------------- | ------------------ | | Component failures | FMEA | | System-level failure | FTA | | Process deviations | HAZOP | | User interaction | Use Error Analysis | | Software behavior | Software FMEA | | Early design phase | PHA |
| Level | Name | Description | Frequency | | ----- | ---------- | ----------------- | ------------ | | P5 | Frequent | Expected to occur | >10⁻³ | | P4 | Probable | Likely to occur | 10⁻³ to 10⁻⁴ | | P3 | Occasional | May occur | 10⁻⁴ to 10⁻⁵ | | P2 | Remote | Unlikely | 10⁻⁵ to 10⁻⁶ | | P1 | Improbable | Very unlikely | <10⁻⁶ |
| Level | Name | Description | Harm | | ----- | ------------ | ----------------------------- | ------------------- | | S5 | Catastrophic | Death | Death | | S4 | Critical | Permanent impairment | Irreversible injury | | S3 | Serious | Injury requiring intervention | Reversible injury | | S2 | Minor | Temporary discomfort | No treatment needed | | S1 | Negligible | Inconvenience | No injury |
See: references/risk-analysis-methods.md
Evaluate risks against acceptability criteria.
Risk Estimated
│
▼
Apply Acceptability Criteria
│
├── Low Risk ──────────► Accept and document
│
├── Medium Risk ───────► Consider risk reduction
│ │ Document ALARP if not reduced
│ ▼
│ Practicable to reduce?
│ │
│ Yes──► Implement control
│ No───► Document ALARP rationale
│
├── High Risk ─────────► Risk reduction required
│ │ Must demonstrate ALARP
│ ▼
│ Implement control
│ Verify residual risk
│
└── Unacceptable ──────► Design change mandatory
Cannot proceed without control
| Criterion | Evidence Required | | --------------------- | --------------------------------- | | Technical feasibility | Analysis of alternative controls | | Proportionality | Cost-benefit of further reduction | | State of the art | Comparison to similar devices | | Stakeholder input | Clinical/user perspectives |
| Situation | Benefit-Risk Required | | --------------------------------------- | --------------------- | | Residual risk remains high | Yes | | No feasible risk reduction | Yes | | Novel device | Yes | | Unacceptable risk with clinical benefit | Yes | | All risks low | No |
Implement and verify risk control measures.
| Priority | Control Type | Examples | Effectiveness | | -------- | ------------------- | ---------------------------------- | ------------- | | 1 | Inherent Safety | Eliminate hazard, fail-safe design | Highest | | 2 | Protective Measures | Guards, alarms, automatic shutdown | High | | 3 | Information | Warnings, training, IFU | Lower |
RISK CONTROL OPTION ANALYSIS
Hazard ID: H-[XXX]
Hazard: [Description]
Initial Risk: P[X] × S[X] = [Level]
OPTIONS CONSIDERED:
| Option | Control Type | New Hazards | Feasibility | Selected |
|--------|--------------|-------------|-------------|----------|
| 1 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
| 2 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
SELECTED CONTROL: Option [X]
Rationale: [Justification for selection]
IMPLEMENTATION:
- Requirement: [REQ-XXX]
- Design Document: [Reference]
VERIFICATION:
- Method: [Test/Analysis/Review]
- Protocol: [Reference]
- Acceptance Criteria: [Criteria]
| Method | When to Use | Evidence | | ---------- | ------------------------ | ----------------- | | Test | Quantifiable performance | Test report | | Inspection | Physical presence | Inspection record | | Analysis | Design calculation | Analysis report | | Review | Documentation check | Review record |
| After Control | Action | | --------------------- | ----------------------------------- | | Acceptable | Document, proceed | | ALARP achieved | Document rationale, proceed | | Still unacceptable | Additional control or design change | | New hazard introduced | Analyze and control new hazard |
Monitor and update risk management throughout product lifecycle.
| Source | Information Type | Review Frequency | | ---------- | ----------------------- | ---------------- | | Complaints | Use issues, failures | Continuous | | Service | Field failures, repairs | Monthly | | Vigilance | Serious incidents | Immediate | | Literature | Similar device issues | Quarterly | | Regulatory | Authority feedback | As received | | Clinical | PMCF data | Per plan |
| Trigger | Response Time | Action | | --------------------- | --------------------- | -------------------- | | Serious incident | Immediate | Full risk review | | New hazard identified | 30 days | Risk analysis update | | Trend increase | 60 days | Trend analysis | | Design change | Before implementation | Impact assessment | | Standards update | Per transition period | Gap analysis |
| Review Element | Frequency | | --------------------------------- | --------------------- | | Risk management file completeness | Annual | | Risk control effectiveness | Annual | | Post-market information analysis | Quarterly | | Risk-benefit conclusions | Annual or on new data |
→ See references/risk-assessment-templates.md for details
What is the risk level?
│
├── Unacceptable ──► Can hazard be eliminated?
│ │
│ Yes─┴─No
│ │ │
│ ▼ ▼
│ Eliminate Can protective
│ hazard measure reduce?
│ │
│ Yes─┴─No
│ │ │
│ ▼ ▼
│ Add Add warning
│ protection + training
│
└── High/Medium ──► Apply hierarchy
starting at Level 1
| Question | If Yes | If No | | ---------------------------------- | --------------------- | --------------------- | | Does control introduce new hazard? | Analyze new hazard | Proceed | | Is new risk higher than original? | Reject control option | Acceptable trade-off | | Can new hazard be controlled? | Add control | Reject control option |
| Condition | Decision | | -------------------------------- | ------------------------------- | | All risks Low | Acceptable | | Medium risks with ALARP | Acceptable | | High risks with ALARP documented | Acceptable if benefits outweigh | | Any Unacceptable residual | Not acceptable - redesign |
| Tool | Purpose | Usage |
| -------------------------------------------------------------- | ---------------------------------- | ----------------------------------------- |
| risk_matrix_calculator.py | Calculate risk levels and FMEA RPN | python risk_matrix_calculator.py --help |
Risk Matrix Calculator Features:
| Document | Content | | ------------------------------------------------------------------------------- | ----------------------------------------------------- | | iso14971-implementation-guide.md | Complete ISO 14971:2019 implementation with templates | | risk-analysis-methods.md | FMEA, FTA, HAZOP, Use Error Analysis methods |
| Stage | Key Activities | Output | | ---------- | ---------------------------------------- | ---------------------- | | Planning | Define scope, criteria, responsibilities | Risk Management Plan | | Analysis | Identify hazards, estimate risk | Hazard Analysis | | Evaluation | Compare to criteria, ALARP assessment | Risk Evaluation | | Control | Implement hierarchy, verify | Risk Control Records | | Residual | Overall assessment, benefit-risk | Risk Management Report | | Production | Monitor, review, update | Updated RM File |
| Skill | Integration Point | | ------------------------------------------------------------------ | ---------------------- | | quality-manager-qms-iso13485 | QMS integration | | capa-officer | Risk-based CAPA | | regulatory-affairs-head | Regulatory submissions | | quality-documentation-manager | Risk file management |
Creator: Ra Qm Team License: MIT Source Repo:
neekware/ehaye-skillsSource Bucket:ra-qm-teamOriginal Path:ra-qm-team/risk-management-specialist
testing
/em -stress-test — Business Assumption Stress Testing
research
/em -postmortem — Honest Analysis of What Went Wrong
development
/em -hard-call — Framework for Decisions With No Good Options
research
/em -challenge — Pre-Mortem Plan Analysis