artifacts/bundle/skills/ra-qm-team/qms-audit-expert/SKILL.md
# QMS Audit Expert ISO 13485 internal audit methodology for medical device quality management systems. --- ## Table of Contents - [Audit Planning Workflow](#audit-planning-workflow) - [Audit Execution](#audit-execution) - [Nonconformity Management](#nonconformity-management) - [External Audit Preparation](#external-audit-preparation) - [Reference Documentation](#reference-documentation) - [Tools](#tools) --- ## Audit Planning Workflow Plan risk-based internal audit program: 1. List all Q
npx skillsauth add neekware/ehayeskills artifacts/bundle/skills/ra-qm-team/qms-audit-expertInstall this skill globally with one command. Works with Claude Code, Cursor, and Windsurf.
3 of 9 scanners reported clean
Some scanners were skipped, did not run, or reported a non-clean status. Review each row below.
ISO 13485 internal audit methodology for medical device quality management systems.
Plan risk-based internal audit program:
| Risk Level | Frequency | Criteria | | ---------- | ----------- | --------------------------------------------- | | High | Quarterly | Design control, CAPA, production validation | | Medium | Semi-annual | Purchasing, training, document control | | Low | Annual | Infrastructure, management review (if stable) |
| Clause | Process | Focus Areas | | ------ | ----------------- | ------------------------------------------------------------ | | 4.2 | Document Control | Document approval, distribution, obsolete control | | 5.6 | Management Review | Inputs complete, decisions documented, actions tracked | | 6.2 | Training | Competency defined, records complete, effectiveness verified | | 7.3 | Design Control | Inputs, reviews, V&V, transfer, changes | | 7.4 | Purchasing | Supplier evaluation, incoming inspection | | 7.5 | Production | Work instructions, process validation, DHR | | 7.6 | Calibration | Equipment list, calibration status, out-of-tolerance | | 8.2.2 | Internal Audit | Schedule compliance, auditor independence | | 8.3 | NC Product | Identification, segregation, disposition | | 8.5 | CAPA | Root cause, implementation, effectiveness |
Verify auditor independence before assignment:
Conduct systematic internal audit:
| Method | Use For | Documentation | | --------------- | --------------------- | ------------------------------- | | Document review | Procedures, records | Document number, version, date | | Interview | Process understanding | Interviewee name, role, summary | | Observation | Actual practice | What, where, when observed | | Record trace | Process flow | Record IDs, dates, linkage |
Document Control (4.2):
Design Control (7.3):
CAPA (8.5):
See references/iso13485-audit-guide.md for complete question sets.
Document each finding with:
Requirement: [Specific ISO 13485 clause or procedure]
Evidence: [What was observed, reviewed, or heard]
Gap: [How evidence fails to meet requirement]
Example:
Requirement: ISO 13485:2016 Clause 7.6 requires calibration
at specified intervals.
Evidence: Calibration records for pH meter (EQ-042) show
last calibration 2024-01-15. Calibration interval is
12 months. Today is 2025-03-20.
Gap: Equipment is 2 months overdue for calibration,
representing a gap in calibration program execution.
Classify and manage audit findings:
| Category | Definition | CAPA Required | Timeline | | ----------- | ---------------------------------------- | ------------- | -------------- | | Major | Systematic failure or absence of element | Yes | 30 days | | Minor | Isolated lapse or partial implementation | Recommended | 60 days | | Observation | Improvement opportunity | Optional | As appropriate |
Is required element absent or failed?
├── Yes → Systematic (multiple instances)? → MAJOR
│ └── No → Could affect product safety? → MAJOR
│ └── No → MINOR
└── No → Deviation from procedure?
├── Yes → Recurring? → MAJOR
│ └── No → MINOR
└── No → Improvement opportunity? → OBSERVATION
| Finding Severity | CAPA Depth | Verification | | ---------------- | ------------------------------------------ | ----------------------------- | | Major | Full root cause analysis (5-Why, Fishbone) | Next audit or within 6 months | | Minor | Immediate cause identification | Next scheduled audit | | Observation | Not required | Noted at next audit |
See references/nonconformity-classification.md for detailed guidance.
Prepare for certification body or regulatory audit:
Documentation:
Personnel:
Facility:
references/iso13485-audit-guide.md contains:
references/nonconformity-classification.md contains:
# Generate optimized audit schedule
python scripts/audit_schedule_optimizer.py --processes processes.json
# Interactive mode
python scripts/audit_schedule_optimizer.py --interactive
# JSON output for integration
python scripts/audit_schedule_optimizer.py --processes processes.json --output json
Generates risk-based audit schedule considering:
Output includes:
{
"processes": [
{
"name": "Design Control",
"iso_clause": "7.3",
"risk_level": "HIGH",
"last_audit_date": "2024-06-15",
"previous_findings": 2
},
{
"name": "Document Control",
"iso_clause": "4.2",
"risk_level": "MEDIUM",
"last_audit_date": "2024-09-01",
"previous_findings": 0
}
]
}
Track audit program effectiveness:
| Metric | Target | Measurement | | -------------------- | ------------ | ---------------------------------- | | Schedule compliance | >90% | Audits completed on time | | Finding closure rate | >95% | Findings closed by due date | | Repeat findings | <10% | Same finding in consecutive audits | | CAPA effectiveness | >90% | Verified effective at follow-up | | Auditor utilization | 4 days/month | Audit days per qualified auditor |
Creator: Ra Qm Team License: MIT Source Repo:
neekware/ehaye-skillsSource Bucket:ra-qm-teamOriginal Path:ra-qm-team/qms-audit-expert
testing
/em -stress-test — Business Assumption Stress Testing
research
/em -postmortem — Honest Analysis of What Went Wrong
development
/em -hard-call — Framework for Decisions With No Good Options
research
/em -challenge — Pre-Mortem Plan Analysis