skills/legal/epc-contract/SKILL.md
Drafts turnkey Engineering, Procurement, and Construction (EPC) contracts for industrial facility projects. Covers scope of work, commercial terms, performance guarantees, risk allocation, warranties, and dispute resolution. Use when drafting EPC agreements, turnkey construction contracts, or energy infrastructure project contracts (power plants, petrochemical facilities, water treatment plants).
npx skillsauth add casemark/skills epc-contractInstall this skill globally with one command. Works with Claude Code, Cursor, and Windsurf.
3 of 9 scanners reported clean
Some scanners were skipped, did not run, or reported a non-clean status. Review each row below.
Drafts a turnkey EPC contract establishing rights, obligations, risk allocations, and technical requirements between a project owner and contractor for design, procurement, construction, testing, and commissioning of an industrial facility.
Gather before drafting:
Draft all 14 sections in order.
Define at minimum:
| Term | Criteria | |---|---| | Substantial Completion | Work complete except punch list; testing passed; performance met; regulatory approvals obtained; O&M docs delivered | | Final Completion | Punch list closed; all performance tests passed at guaranteed levels; reliability demo done; training complete; final documentation | | Contract Price | Fixed amount, inclusions, adjustment mechanisms | | Change Order | Written modification to scope, schedule, or price | | Force Majeure | Natural disasters, war, epidemics, government action, non-party labor disputes | | Defect | Non-conformance with specs, drawings, guarantees, or codes | | Warranty Period | Commencement trigger and duration |
Include project-specific technical terms referencing industry standards (ASME, IEEE, ISA).
A. Engineering — All disciplines (civil/structural, mechanical, electrical, I&C, process, environmental, safety); conceptual through detailed.
B. Procurement — Major equipment (turbines, generators, compressors, vessels, heat exchangers), bulk materials, spare parts, special tools. Identify owner-furnished items with interface requirements.
C. Construction & Installation — Site prep, civil, foundations, structural, mechanical/piping, electrical/instrumentation, insulation/painting/fireproofing. Reference applicable codes.
D. Testing & Commissioning — Factory acceptance → pre-commissioning → integrated systems → performance testing → reliability demo. Include owner witness rights and acceptance criteria.
E. Ancillary — Permitting (allocate owner vs. contractor), training (classroom + hands-on), documentation deliverables (design basis, as-builts, O&M manuals — specify format/schedule).
F. Exclusions — Land acquisition, off-site utilities to boundary, owner personnel, financing, owner-controlled insurance, owner permits.
Contract Price: Exact amount and currency. Pricing type (lump-sum/GMP/cost-plus/hybrid). Confirm all E, P, C, testing, commissioning, training, documentation included. Adjustments limited to owner changes, differing site conditions, force majeure, change in law.
Payment Schedule:
| Milestone | Typical % | Conditions | |---|---|---| | Advance payment | 5–10% | Advance payment guarantee required | | Engineering milestones | Per deliverable | Basic/detailed design completion | | Equipment delivery | Per item value | Delivery receipts | | Construction progress | Monthly | Joint measurement/verification | | Substantial Completion | Major tranche | Less retention | | Final Completion | Balance + retention | All guarantees satisfied |
Delay Management:
| Delay Type | Time Extension | Cost Recovery | |---|---|---| | Force majeure | Yes | No | | Change in law | Yes | No | | Government permit delays | Yes | No | | Owner-caused delays | Yes | Yes | | Owner scope changes | Yes | Yes | | Differing site conditions | Yes | Yes |
Guaranteed Parameters (select applicable):
| Parameter | Value | Reference Conditions | Test Standard | |---|---|---|---| | Output capacity | [kW/units] | ISO or site ambient | ASME PTC | | Efficiency/heat rate | [%/BTU/kWh] | Fuel spec, ambient | ASME PTC | | Emissions | [g/unit] per pollutant | Operating conditions | EPA/regulatory | | Availability | [%] | Defined period | Contract formula |
Performance LDs:
| Shortfall | LD Formula | Cap | |---|---|---| | Capacity | $/unit below guarantee | [X]% of contract price | | Efficiency | PV of increased operating costs | [X]% of contract price | | Emissions | Cost of additional controls | [X]% of contract price |
Contractor indemnifies Owner for: bodily injury/death, property damage, regulatory violations, IP infringement, environmental contamination, breach.
Owner indemnifies Contractor for: owner negligence/willful misconduct/breach; defects in owner-furnished items.
Exceptions: Claims from sole negligence of indemnified party. Joint negligence: comparative fault.
Procedure: Prompt notice → indemnifying party controls defense → cooperation → settlement limits.
Liability caps:
| Coverage | Minimum Limit | Requirements | |---|---|---| | CGL | $10–50M per occurrence/aggregate | Additional insured; primary & non-contributory | | Workers' Comp | Statutory per jurisdiction | Employers' liability $1M | | Auto Liability | $1M CSL | All owned/hired/non-owned | | Professional Liability (E&O) | $5–25M per claim/aggregate | Claims-made with 3–5 year tail | | Builder's Risk | Full replacement value | Specify owner vs. contractor placement | | Marine Cargo | Full shipment value | If international; origin to site | | Pollution Liability | Project-appropriate | If environmental risk | | Umbrella/Excess | Project-appropriate | Above primary policies |
All policies: owner as additional insured, waiver of subrogation, 30-day cancellation notice, certificates before work starts.
| Trigger | By | Notice/Cure | Contractor Gets | |---|---|---|---| | Cause (abandonment, schedule failure, insolvency) | Owner | Written + 10–30 day cure | Work performed only; liable for excess costs | | Convenience | Owner | Written notice | Work + materials + demobilization + OH (no profit on unperformed) | | Owner default (non-payment, suspension, breach) | Contractor | Written + cure period | Work + costs + anticipated profit on full contract | | Extended force majeure (>6 months) | Either | Written notice | Work + costs (no anticipated profit) |
Tiered process:
Signature blocks: entity name, signature, printed name, title, date. Add notarization/witness if required by governing law.
tools
Audits the complete in-scope medical-record universe in a litigation matter and produces an attorney-facing, Bates-cited analysis of treatment gaps, missing records or providers, baseline coverage, material billing or production mismatches, and complaint evolution. Use when asked to find missing medical records, analyze treatment gaps or first-care timing, identify absent providers, assess whether a production is complete, or prepare a records-request target list. Use medical-record-chronology instead when the primary request is a chronological clinical narrative.
development
Drafts a legally compliant Private Placement Memorandum for Regulation D offerings (Rule 506(b)/506(c)), covering full disclosure framework including risk factors, capitalization, securities terms, use of proceeds, and investor qualification requirements. Enforces SEC anti-fraud compliance under Section 10(b)/Rule 10b-5, blue sky law considerations, and accredited investor verification under Rule 501. Use this skill when drafting PPMs, offering memorandums, Reg D disclosure documents, or private offering circulars for issuers raising capital from sophisticated investors. Also trigger when the user mentions private placement disclosure, offering memorandum, Reg D fundraising, or accredited investor verification. Even if the user just says "PPM" or "draft our offering memo," use this skill.
data-ai
Generates structured privacy and data protection law briefings across US, EU, UK, and other jurisdictions. Organizes by jurisdiction with compliance deadlines, enforcement actions, and legislative changes. Use when preparing privacy law briefings, compliance updates, regulatory change summaries, or data protection landscape reviews.
testing
Generates structured summaries of prior art references for patent prosecution, validity analysis, and freedom-to-operate assessments. Maps disclosures to claim elements with precise citations. Use when summarizing prior art, analyzing patent landscapes, mapping references to claims, or preparing office action responses.